Description
Excavator Mounted Hydraulic Rock Splitter
Superdrill is a famous brand for professional manufacturing of Excavator Mounted Rock Machines includes: Hydraulic Rock Breaker (Excavator Mounted Hammer) – Especially our silent breaker is excellent low noise breaker – Super Wedge (Excavator Mounted Rock Splitter) – rock drills ( Excavator Mounted Rock Drills )
Jumbo Super Wedge :
Jumbo Super Wedge as attachment is designed for most of hydraulic Excavators to form Excavator Mounted Jumbo Splitter which can be used for large volumes of hard rock where blasting is not practical or allowed, also not suitable for traditional hand-held hydraulic rock splitter worKing like DARDA orSuperdrill rock splitter.
Its Working principle is Like universal Hydraulic rock splitters consist of two wedges which are inserted in a pre-drilled hole and a hydraulic cylinder is pushing out a over-sized center wedge between the two side super sized counter wedges forcing them to separate.
This new design, it is more advance and high efficiency and productivity than traditional hand held hydraulic splitter. There are two model of Jumbo Super Wedge, Vertical Fix type , Rotation type, according to their purpose and size of machine.
For vertical applications (shaft-sinking, open pit excavation), the rock splitter is mounted on a chain or wire from a conventional excavator of 12-tons class or larger.
For horizontal applications (tunneling), the splitter is mounted on a specialized carrier with telescopic boom and rotator for rotation 360 degree.
Work process
a. Drill the hole of which diameter is bigger than 80mmØ and 1~3 meter deep by crawler drill, or Prodrill Excavator- Mounted Rock Drills available.
b. Switch on the Power switch on the control box.
c. Control the counter wedge is toward free face by wedge turning lever
d. Put the power jumbo cylinders into the holes and then push the rock toward the free face side. e. Super wedge rock splitters consist of two over size wedges which are inserted in a pre-drilled hole and a hydraulic cylinder is pushing out a jumbo center wedge between the two side wedges forcing them to separate
f. Push down the center wedge by lever on the control box , Totally 12,000~ 24,00 ton power pushes the rock for 2-4 minute and then the rock will be split.
g. Breaking the rock, pull out the center wedge to the end.
h. Take out the wedge set from the hole for next hole break job.